The total value of the Project is 378,893,987 lei (equivalent in lei of 76,331,437 euro), of which the maximum insured value from the Modernization Fund is 265,225,791 lei (equivalent in lei of 53,432,006 euro -70% of the total value of the Project).
Ișalnița Photovoltaic Park will be built on the slag and ash deposits, left and right water edge of Jiu River, in Ișalnița, Dolj county, longitude 23,69 E, latitude 44,38 N.
The deposits belong to the Ișalnița Thermal Power Plant and are located at cca. 2,5 km away from it.
Activity | Start date | End date |
---|---|---|
1. Financing contract |
2022 |
2023 |
2. Contracting procedures |
2023 |
2024 |
3. Execution of works |
2024 |
2025 |
|
2024 |
2024 |
4. Communication, information and publicity |
2023 |
2025 |
Item No. |
Indicator name | Unit of measurement | Target value |
---|---|---|---|
1 |
Installed operational capacity for renewable energy generation |
MWp |
85 |
2 |
Total CO2 savings |
tCO2/an |
88.735 |
3 |
Average electricity production from renewable sources |
MWh/an |
101.065 |